Vistra

An American power producer: it runs gas, coal and nuclear plants, sells the electricity to 5 million homes and businesses, and uses each side to hedge the other.

Our viewNeutral Medium conviction
The scores
The profile · 1-4
Growth3/4 ↑

Ongoing Operations Adjusted EBITDA is up over 30% YoY, but a material part is Energy Harbor/Lotus/Cogentrix M&A and hedge/price timing, not pure organic volume growth.

Business quality3/4 →

Irreplaceable licensed nuclear/coal plus an integrated retail hedge command real premiums, but untested by the emerging behind-the-meter substitution wave.

Financial position3/4 →

Investment-grade at two of three agencies with $6.3B of liquidity, but net debt rose about $3B in six months as acquisitions and buybacks ran together.

Execution record3/4 →

Guidance held through an ERCOT pullback and the buyback target was hit early, but the post-2021 restructured entity's clean record is still short.

Per share capture4/4 →

171 million shares retired against one small Cogentrix-related issuance - buybacks dominate the share-count trend by a wide margin.

Potential3/4 ↑

A large upside on observable steps - Batch Zero, Cogentrix, uprates - with one piece, the Meta PPA, already committed and in progress.

Risk profile3/4 →

A real regulatory dependency (Batch Zero, PJM tariff filings) and hedge-driven earnings volatility, but diversified across ERCOT/PJM/other ISOs and survivable if either resolves unfavorably.

Valuation3/4 →

EV/TTM Adjusted EBITDA near 10.0x sits below VST's own five-year median and only modestly above the peer GAAP-basis reading, once distortion is accounted for.

Evidence quality3/4 →

Central claims are mostly primary filings and transcript, cross-checked externally, but the cohort is thin and the TTM EBITDA figure is hand-computed, not filed.

The Verdict

We rate Vistra attractive. It runs gas, coal and nuclear plants that nobody can build again soon, and sells their power both wholesale and to its own retail customers, a solid business. Its reported profit swings because hedging contracts are revalued every quarter, but the cash business underneath grew over 30% last quarter. On that underlying profit the shares cost less than their own five-year norm, so the price is fair, needing only the forecast, with the AI demand close to free. The view hinges on management holding its 2027 profit aim as Texas power prices soften.

The long caseAI data centres, factories and a growing population are raising power demand in Texas and the eastern grid faster than in decades, and Vistra's existing plants sell into it.

The evidence under this - 8 claims
C01facthigh confidence
Vistra's generation fleet totals about 43,600 MW: 62% natural gas, 20% coal/lignite, 15% nuclear, 3% solar/battery.
historical · as of 2025-12-31written 2026-09-15
C03facthigh confidence
Q2 2026 Ongoing Operations Adjusted EBITDA was $1,767M versus $1,349M in Q2 2025, over 30% growth.
historical · Q2 2026written 2026-09-15
C05management claimmedium confidence
Vistra maintained its 2027 Adjusted EBITDA midpoint opportunity of $7.4-7.8B despite ERCOT forward curves falling versus the October 2025 basis, citing PJM strength, hedging and the nuclear PTC as offsets; the range excludes Cogentrix and Meta PPA contributions.
against this

ERCOT day-ahead prices have run near half of the prior year's level for parts of 2026 per management's own commentary, and the 12-15 GW of realistic new ERCOT load Vistra is banking on (C29) is itself a management estimate rather than a filed figure.

forwardwritten 2026-09-15
C06facthigh confidence
Q2 2026 GAAP net income of $305M absorbed a $472M unrealized loss from hedges expected to settle in future years.
historical · Q2 2026written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 10.0x, below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

current state · 2026-08-24written 2026-09-15
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C19facthigh confidence
Vistra owns six nuclear units at four sites totaling 6,448 MW: Comanche Peak 1&2 in ERCOT (2,400 MW, licensed to 2050/2053), Beaver Valley 1&2, Perry and Davis-Besse in PJM (4,048 MW combined, licensed 2036-2047).
historical · as of 2025-12-31written 2026-09-15
C36factmedium confidence
No nuclear reactors are under construction in the United States today; Vogtle Units 3 and 4 were the only large reactors completed in the US in the past decade, and a stated 2030 policy goal for new reactor construction has not yet resulted in any breaking ground.
current state · 2026-08-24written 2026-09-15
01

The company

Vistra's fleet is 62% gas, 20% coal, 15% nuclear and 3% solar and batteries, selling into six American wholesale power markets, mainly Texas's grid, ERCOT, and PJM in the mid-Atlantic and Midwest.

It also sells electricity and gas directly to about 5 million homes and businesses in 18 states and Washington, DC. A buyer who does not use Vistra buys from a rival generator on the same grid, or builds its own plant.

The evidence under this - 2 claims
C01facthigh confidence
Vistra's generation fleet totals about 43,600 MW: 62% natural gas, 20% coal/lignite, 15% nuclear, 3% solar/battery.
historical · as of 2025-12-31written 2026-09-15
C02facthigh confidence
Vistra sells into six US wholesale markets (principally ERCOT and PJM) and serves about 5 million retail electricity and gas customers across 18 states and DC.
current state · 2025-12-31written 2026-09-15

How it makes money

It earns the gap between what it costs to run its plants and what power sells for. Owning both the plants and the customers lets it lock in prices years ahead: when wholesale prices fall, retail margins cushion the blow. The contracts that do that are revalued every quarter, which is why reported profit jumps around while cash does not.

The evidence under this - 3 claims
C02facthigh confidence
Vistra sells into six US wholesale markets (principally ERCOT and PJM) and serves about 5 million retail electricity and gas customers across 18 states and DC.
current state · 2025-12-31written 2026-09-15
C06facthigh confidence
Q2 2026 GAAP net income of $305M absorbed a $472M unrealized loss from hedges expected to settle in future years.
historical · Q2 2026written 2026-09-15
C07facthigh confidence
FY2025 operating revenue growth of $514M (to $17,738M) was reported net of a $1.8B increase in unrealized mark-to-market losses on commodity derivatives embedded in that revenue line.
historical · FY2025written 2026-09-15
Where the money comes from, stream by stream
StreamShare of sales (FY2025)How it earns it
Retail electricity in Texas (ERCOT)50.5%Energy charges billed to homes and businesses through TXU Energy and other brands, per kilowatt-hour delivered.
Retail electricity in the Northeast and Midwest22.9%The same retail service sold under several brands in the deregulated states outside Texas.
Wholesale generation sold into grid markets18.0%Power from its gas, coal, nuclear and solar plants sold to grid operators such as ERCOT and PJM at market prices.
Other wholesale contracts6.5%Ancillary services, auction revenue and sales to other retailers, municipalities and wholesale buyers.
Capacity payments1.3%Net payments from grid operators, mostly PJM, for keeping plants available, after capacity Vistra buys.
Hedging, tax credits and other0.9%Realized hedge gains and transferable nuclear tax credits, offset in 2025 by unrealized hedge losses.

Who runs it

Jim Burke has run Vistra since 2022, after years as its finance and operations chief; Kris Moldovan, a company veteran, has run the money since the same year. On their watch Vistra bought more power plants, signed long nuclear contracts with big tech buyers and beat its own profit forecast. Insiders own under 1% of the company. Bonuses ride on adjusted profit and cash flow; long-term shares on cash flow per share and the stock against the market.

The evidence under this - 3 claims
C47facthigh confidence
James Burke has been president and chief executive since August 1, 2022, after serving as president and chief financial officer from December 2020 and chief operating officer from October 2016; Kristopher Moldovan has been chief financial officer since August 2022, after five years as treasurer; Scott Helm has chaired the board since October 2017.
current state · 2026-03-18written 2026-10-04
C46facthigh confidence
Vistra's 2025 annual bonus paid on Adjusted EBITDA (25%), Adjusted free cash flow before growth (25%), total cost (10%) and generation, retail and stakeholder indices (40%), and funded at 130%; long-term awards are 65% PSUs on three-year Adjusted FCF before growth per share with a plus-or-minus 25% modifier for return against the S&P 500, and 35% RSUs. The 2023 PSUs paid 200% of target.
against this

Both bonus profit metrics exclude unrealized hedge losses and were targeted at the guidance midpoint, which Vistra beat; nothing pays on the return earned on acquisitions, the main use of growth capital.

historical · FY2025written 2026-10-04
C45facthigh confidence
As of March 3, 2026 the 15 directors and executive officers as a group beneficially owned 3,103,579 shares, under 1% of the 338,549,292 outstanding (about 0.9%); chief executive James Burke held 1,513,011 including 331,685 vested options, the largest insider; Vanguard (12.6%), BlackRock (8.4%), Qatar Investment Authority (5.5%) and FMR (5.1%) were the holders above 5%. Vistra has one class of common stock.
current state · 2026-03-03written 2026-10-04
02

Why it wins, and who could beat it

Why customers come back

Its six nuclear reactors, 6,448 MW licensed to run into the 2030s and beyond, cannot be copied: no large reactor is under construction anywhere in the United States, and only two were finished in the past decade.

That scarcity is why a technology company wanting steady, carbon-free power for decades came to Vistra's existing plants, at a price the finance chief called above market, instead of waiting for someone to build new ones.

The evidence under this - 3 claims
C19facthigh confidence
Vistra owns six nuclear units at four sites totaling 6,448 MW: Comanche Peak 1&2 in ERCOT (2,400 MW, licensed to 2050/2053), Beaver Valley 1&2, Perry and Davis-Besse in PJM (4,048 MW combined, licensed 2036-2047).
historical · as of 2025-12-31written 2026-09-15
C36factmedium confidence
No nuclear reactors are under construction in the United States today; Vogtle Units 3 and 4 were the only large reactors completed in the US in the past decade, and a stated 2030 policy goal for new reactor construction has not yet resulted in any breaking ground.
current state · 2026-08-24written 2026-09-15
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15

The threat

Data-centre owners are starting to build their own power. About 2 GW of off-grid generation was running by mid-2026, most of it gas turbines at xAI's sites, and Microsoft and Oracle are pursuing on-site power too. Every data centre powered that way is demand that never reaches Vistra's grid.

The evidence under this - 1 claim
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15

The rivals: SPCX, BE, MSFT, NRG, CEG, TLN.

Who else does this, rival by rival
TickerRivalHow far alongPriced against it
SPCXxAI (Colossus 1 and 2 gas-turbine sites near Memphis)Priced against it: Different productOn saleDifferent product
BEBloom Energy (fuel-cell systems; 2.8 GW master agreement with Oracle within $7.65B of 2026 data-center contracts)Priced against it: Different productOn saleDifferent product
MSFTMicrosoft (announced gas-turbine-powered data-center sites)Priced against it: Different productAnnouncedDifferent product
NRGNRG EnergyPriced against it: YesOn saleYes
CEGConstellation EnergyPriced against it: YesOn saleYes
TLNTalen EnergyPriced against it: No usable figureOn saleNo usable figure
03

How big it could get

How big this could get

Demand is rising after decades of flat growth. Texas's grid peaked at 83.7 GW in 2025 and above 91 GW in July 2026, and its planners point to about 152 GW by 2030.

The queue of requests to connect large new users there is reported near 410 GW, mostly data centres. Vistra's own chief executive thinks only 12 GW to 15 GW of that is realistic by 2030.

The evidence under this - 4 claims
C26facthigh confidence
ERCOT's 2025 peak demand was about 83,707 MW serving roughly 27 million Texas customers (about 90% of the state's load); ERCOT set a new all-time peak above 91 GW in July 2026.
historical · 2025 and July 2026written 2026-09-15
C31factmedium confidence
ERCOT's own transmission planning has pointed to systemwide new load reaching roughly 152 GW by 2030.
forwardwritten 2026-09-15
C28factmedium confidence
ERCOT's large-load interconnection queue has been reported at 410 GW of requests, about 87% of which are data centers.
current state · 2026-04-01written 2026-09-15
C29management claimlow confidence
Vistra's CEO reiterated the company's unchanged May-2024 forecast of 115-120 GW of total ERCOT load by 2030, and stated his own view that only about 12-15 GW of the queue reflects realistic, contractable load by 2030 - calling the headline queue overstated by more than 20 times.
against this

This 12-15 GW figure is Vistra's own filtering of the queue and is not independently verifiable; ERCOT and the Public Utility Commission of Texas's own Batch Zero audit (C32) exists precisely because nobody outside the generators has published a verified conversion rate from queue to real load (see machine.prize.composed_route).

forwardwritten 2026-09-15

Who has signed

One large buyer. Meta signed 20-year agreements for 2,609 MW from Vistra's nuclear plants in the PJM region, starting late 2026. Everything else in the data-centre story, including all of Texas, is still in negotiation.

The evidence under this - 1 claim
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
04

The results

The numbers

Is it growing?Slow

Sales grew 3.8% over the twelve months to Jun 2026, about the same pace as the 3.0% in the year to Dec 2025.

Dec 2021: $12.1BDec 2022: $13.7BDec 2023: $14.8BDec 2024: $17.2BDec 2025: $17.7B12 mo to Jun 2026: $19.2B$12.1B$19.2B
Is it profitable?Healthy

Operating margin is 19%, about where it was (18%) in the year to Dec 2023.

Dec 2021: −13%Dec 2022: −8.6%Dec 2023: 18%Dec 2024: 24%Dec 2025: 11%12 mo to Jun 2026: 19%−13%19%
How steady is it?Steady

Yearly sales growth has ranged from +3.0% to +17% over the last 5 years.

Dec 2021: +5.5%Dec 2022: +14%Dec 2023: +7.7%Dec 2024: +17%Dec 2025: +3.0%+5.5%+3.0%
Does it earn good returns?Decent

Each dollar put into the business earns 12% a year after tax, about where it was (11%) in the year to Dec 2023.

Dec 2023: 11%Dec 2024: 16%Dec 2025: 7.0%12 mo to Jun 2026: 12%11%12%
Is it making cash?Solid

It turned 12% of sales into free cash, $2.25B over the last twelve months.

Dec 2021: −$1.24BDec 2022: −$816MDec 2023: $3.78BDec 2024: $2.48BDec 2025: $1.32B12 mo to Jun 2026: $2.25B−$1.24B$2.25B
Is the balance sheet safe?Heavy debt

It owes $19.2B more than the cash it holds, about 3.7 years of the cash its operations bring in.

Dec 2021: −$9.41BDec 2022: −$12.2BDec 2023: −$10.9BDec 2024: −$15.1BDec 2025: −$18.1B12 mo to Jun 2026: −$19.2B−$9.41B−$19.2B
Are shares being diluted?Shrinking

The share count fell 30% in 4.5 years, and pay in shares costs 0.7% of sales.

Dec 2021: 482MDec 2022: 422MDec 2023: 375MDec 2024: 353MDec 2025: 346M12 mo to Jun 2026: 339M482M339M
All the numbers

Filed figures from the company's 10-K and 10-Q, read 2026-10-04. Fiscal years end in December.

Dec 2021Dec 2022Dec 2023Dec 2024Dec 202512 mo to Jun 2026
Size and growth
Sales$12.1B$13.7B$14.8B$17.2B$17.7B$19.2B
Sales growth+5.5%+14%+7.7%+17%+3.0%+3.8%
Profit
Operating margin−13%−8.6%18%24%11%19%
Net margin−11%−8.9%10%15%5.3%12%
What growth costs, per sales dollar
Selling, general and admin8.6%8.7%8.9%9.3%9.7%9.0%
Pay in shares0.4%0.5%0.5%0.6%0.6%0.7%
Capital spending8.6%9.5%11%12%16%15%
Cash
Cash from operations−$206M$485M$5.45B$4.56B$4.07B$5.12B
Free cash flow−$1.24B−$816M$3.78B$2.48B$1.32B$2.25B
Balance sheet
Cash and short-term investments$1.32B$455M$3.48B$1.19B$785M$435M
Debt$10.7B$12.6B$14.4B$16.3B$18.8B$19.6B
Net cash−$9.41B−$12.2B−$10.9B−$15.1B−$18.1B−$19.2B
Returns and shares
Return on capital--11%16%7.0%12%
Shares (diluted)482M422M375M353M346M339M

What growth costs

Running Vistra gets no cheaper as it grows: office and selling costs rise in step with sales. Growth costs capital instead, buying plants and spending more each year upgrading them, so whether growing makes it more profitable depends on what those plants earn, which the reported figures, swung by hedging gains and losses, do not yet show.

The evidence under this - 2 claims
C43facthigh confidence
Per sales dollar, selling, general and administrative costs were 9.0 cents in 2020, 8.6 to 8.9 cents in 2021 to 2023, 9.3 in 2024, 9.7 in 2025 and 9.0 over the four quarters to June 2026, while capital spending rose from 8.6 cents in 2021 to 15.5 in 2025 and 14.9 over the four quarters, and stock pay stayed under one cent; revenue rose from $11,443M in 2020 to $17,738M in 2025.
against this
  • Revenue carries unrealized hedge marks, a $766M loss in 2025 against a $1,013M gain in 2024 (C07, C42), so every per-sales-dollar ratio moves with commodity prices as well as with costs.
  • The 2025 pay plan's total-cost metric missed its threshold, on growth projects, the Martin Lake 1 repair and integration costs (S20), so costs outside SG&A did rise faster than planned.
historical · 2020 to the four quarters to June 2026written 2026-10-04
C44inferencemedium confidence
Vistra's growth is bought with capital rather than overhead: acquisitions (Energy Harbor in 2024, Lotus in 2025, Cogentrix pending) and rising plant spending carry it while SG&A holds near nine cents per sales dollar, so whether growth widens the margin depends on what the bought and upgraded plants earn, which GAAP margins swung by hedge marks cannot show.
derivedC43's cost ratios, the acquisitions in C22, C21 and C48, and the hedge marks in C07 and C42
historical · 2020 to the four quarters to June 2026written 2026-10-04

The last report (7 Aug)

Quarter ended June 2026, filed figures.

-5%
Sales growth
against the same quarter a year earlier
-28.8%
Growth from the quarter before
against 23.0% the quarter before that
14¢
Operating profit
per dollar of sales

The June 2026 quarter looked like a miss: earnings per share of $0.76 against the $1.61 analysts expected, and revenue well short. It was not an operating miss.

A $472M paper loss on contracts protecting future prices went through the accounts. Underlying profit, the company's own measure without those swings, rose to $1,767M from $1,349M, over 30%. Management kept its 2026 forecast of $6.8B to $7.6B and its $7.4B to $7.8B aim for 2027, even as Texas power prices for future delivery fell.

What it did to the thesisIt supported the Attractive case: the earnings miss came from paper losses on hedges, while the company's own measure of underlying profit grew strongly and both forecasts held. What it left open is whether those forecasts survive weaker Texas power prices.

The quarter in detail

Sales growth from the previous quarter, filed figures.

Earnings per share $0.76 against $1.61 expected; $0.76 as filed, with no adjustments.

The evidence under this - 5 claims
C39facthigh confidence
Q2 2026 GAAP diluted EPS of $0.76 missed the $1.61 consensus estimate by 52.8%, driven by the unrealized hedge mark-to-market loss (C06) rather than an operating shortfall - Ongoing Operations Adjusted EBITDA grew over 30% in the same quarter (C03).
historical · Q2 2026written 2026-09-15
C06facthigh confidence
Q2 2026 GAAP net income of $305M absorbed a $472M unrealized loss from hedges expected to settle in future years.
historical · Q2 2026written 2026-09-15
C03facthigh confidence
Q2 2026 Ongoing Operations Adjusted EBITDA was $1,767M versus $1,349M in Q2 2025, over 30% growth.
historical · Q2 2026written 2026-09-15
C04management claimmedium confidence
Vistra reaffirmed 2026 guidance of $6.8-7.6B Ongoing Operations Adjusted EBITDA and $3.925-4.725B Adjusted FCF before growth.
against this

2026 guidance is management's own forward range, reaffirmed on the same call it could have been cut on; the honest test is whether it is delivered at Q3 2026, not whether it was restated in August.

forwardwritten 2026-09-15
C05management claimmedium confidence
Vistra maintained its 2027 Adjusted EBITDA midpoint opportunity of $7.4-7.8B despite ERCOT forward curves falling versus the October 2025 basis, citing PJM strength, hedging and the nuclear PTC as offsets; the range excludes Cogentrix and Meta PPA contributions.
against this

ERCOT day-ahead prices have run near half of the prior year's level for parts of 2026 per management's own commentary, and the 12-15 GW of realistic new ERCOT load Vistra is banking on (C29) is itself a management estimate rather than a filed figure.

forwardwritten 2026-09-15
What management did with the money

It has bought back about 30% of its shares since November 2021, at an average of about $38, and has $1.2B of authority left. It is also buying: Cogentrix's 10 gas plants for about $2.3B in cash plus shares. Debt rose to $19.6B from $17.0B in six months.

The evidence under this - 4 claims
C13facthigh confidence
Vistra has retired about 171 million shares since November 2021 at an average cost of about $38 per share, returning $6.5B to shareholders through August 3, 2026, a roughly 30% reduction in shares outstanding.
historical · November 2021 - August 2026written 2026-09-15
C14management claimmedium confidence
About $1.2B of buyback authorization remained as of August 2026, expected to be exhausted no later than end of 2027; management said it would seek additional authorization if it adds to the program in 2026.
against this

Management's own language - 'we expect to exhaust that no later than end of 2027' - is itself a target, not a commitment, and the same capital could instead go to additional debt paydown if the investment-grade ratings push takes priority, which management named as a live alternative use of cash.

forwardwritten 2026-09-15
C21facthigh confidence
Vistra agreed to acquire Cogentrix Energy (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility) for approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares; FERC approval was received and close is expected mid-to-late 2026.
forwardwritten 2026-09-15
C16facthigh confidence
Long-term debt including amounts due currently rose to $19,595M at June 30, 2026 from $17,043M at December 31, 2025.
current state · 2026-06-30written 2026-09-15
05

The price, and where we disagree

In short. Fair. Cheap on the profit the business actually makes, as long as the forecast holds; the AI demand comes close to free.

Share price
$136.21
close,
Company value for each $1 of cash profit
21.1
rivals' middle 14.1

Most coverage calls Vistra an AI-power play, and the standard price-to-earnings figure makes it look expensive. That figure is struck on the distorted reported profit. On the underlying profit the shares are cheaper than their own history.

The next test is the November 5 results: whether management holds its 2027 aim with Texas power prices softer.

The evidence under this - 3 claims
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 10.0x, below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

current state · 2026-08-24written 2026-09-15
C05management claimmedium confidence
Vistra maintained its 2027 Adjusted EBITDA midpoint opportunity of $7.4-7.8B despite ERCOT forward curves falling versus the October 2025 basis, citing PJM strength, hedging and the nuclear PTC as offsets; the range excludes Cogentrix and Meta PPA contributions.
against this

ERCOT day-ahead prices have run near half of the prior year's level for parts of 2026 per management's own commentary, and the 12-15 GW of realistic new ERCOT load Vistra is banking on (C29) is itself a management estimate rather than a filed figure.

forwardwritten 2026-09-15
How we read the multiple

Counting its debt, the whole company costs about $66B, roughly 10 times last year's underlying profit before interest, tax and depreciation of about $6.6B, and about 9.2 times this year's forecast.

On reported profit, which paper losses on hedges pull down, it is about 21 times. So the price mainly asks that the forecast arrives. It pays little for signed data-centre demand beyond Meta, which is where the upside sits.

Against its own history. Below its own normal on underlying profit. The reported figure makes it look dear, but that comes from paper losses on hedges, not the business.

The evidence under this - 5 claims
C10estimatehigh confidence
Enterprise value is approximately $65,955M: market cap $45,928M plus net debt of approximately $20,027M (long-term debt $19,595M, AR financing $300M, forward repurchase obligation $613M, less cash $435M and restricted cash $46M).
derived10-Q balance sheet (S02) and market-tier market capitalisation (S16).
against this

Net debt is a snapshot at 2026-06-30 and has already risen roughly $3B in six months (C16); using a post-Cogentrix-close balance sheet instead would show meaningfully more leverage against the same EBITDA base, making the multiple look more expensive than this snapshot does.

current state · 2026-06-30written 2026-09-15
C09estimatemedium confidence
TTM Ongoing Operations Adjusted EBITDA through Q2 2026 is approximately $6,584M, computed as FY2025 ongoing-ops EBITDA ($5,912M) minus H1 2025 ($2,589M) plus H1 2026 ($3,261M).
derivedC08 plus the H1 2025 ($2,589M) and H1 2026 ($3,261M) Ongoing Operations Adjusted EBITDA figures disclosed on the Q2 2026 earnings call (S04) and release (S03).
against this

This is a hand-computed TTM figure, not a single filed number - it depends on H1 2025/H1 2026 Ongoing Operations figures being genuinely comparable across two different guidance vintages and any quarterly restatement between them would move it without a corresponding filing to flag it.

current state · 2026-06-30written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 10.0x, below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

current state · 2026-08-24written 2026-09-15
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C41facthigh confidence
NRG Energy, Talen Energy and Constellation Energy each describe themselves, in their own FY2025 10-Ks, as generation-plus-retail or wholesale merchant power businesses selling into the same kind of ISO markets Vistra sells into, and were identified as cohort peers on that basis since Vistra's own 10-K names only competitor classes.
current state · 2026-08-24written 2026-09-15
Priced against its rivals

The competitors its own annual report names, each confirmed against the rival's filing. Measured on company value for each $1 of cash profit, cheapest first:

TickerCompanycompany value for each $1 of cash profit
NRGNRG Energy11.3×
CEGConstellation Energy16.8×
VSTVistra21.1×
TLNTalen Energy held outnot priced

The middle of the other 2 is 14.1. Vistra Corp. is dearest of 3.

Rivals' figures come from a data provider, so read the spread of the group rather than any single pair.

The rivals' figures are struck on reported profit, which the hedges distort, so the comparison proves little either way and cannot move our view.

Where we disagree with the market

The market believes

An AI-power story, with a high price-to-earnings figure showing the market has already paid up for it.

We believe

The reported swings are mostly hedge accounting. On what the business actually earns, the market has not paid for the AI story at all.

The gap sits in a reconciliation table few people read, and even the data vendor's comparison with rivals uses the distorted figure.

The case against us: most AI demand is unsigned, Texas power prices for future delivery have softened, and data centres can build their own plants. A cut to the 2027 aim, rather than softer words, would prove us wrong.

What analysts say, and the evidence
The evidence under this - 4 claims
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C05management claimmedium confidence
Vistra maintained its 2027 Adjusted EBITDA midpoint opportunity of $7.4-7.8B despite ERCOT forward curves falling versus the October 2025 basis, citing PJM strength, hedging and the nuclear PTC as offsets; the range excludes Cogentrix and Meta PPA contributions.
against this

ERCOT day-ahead prices have run near half of the prior year's level for parts of 2026 per management's own commentary, and the 12-15 GW of realistic new ERCOT load Vistra is banking on (C29) is itself a management estimate rather than a filed figure.

forwardwritten 2026-09-15
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
06

What could go wrong, and how we would know

The risks

  • Demand that routes around it. Data-centre owners building their own gas turbines or fuel cells never need to buy from Vistra's grid.
  • Softer Texas prices. Battery buildout and a market redesign have lowered Texas power prices, and forecasts for 2026 demand growth were cut.
  • Debt and buybacks together. Borrowing rose $2.6B in six months while buybacks and a $2.3B acquisition continue.
  • A paused connection queue. A Texas audit has paused reviews of large new users, and it has already run longer than management expected.
The evidence under this - 8 claims
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15
C33factmedium confidence
ERCOT implemented its RTC+B (Real-Time Co-optimization Plus Batteries) market redesign on December 5, 2025, removing the ORDC scarcity-price adder from energy prices and replacing it with Ancillary Service Demand Curve adders, which pay only for delivered service rather than for standing by during scarcity.
historical · 2025-12-05written 2026-09-15
C34management claimmedium confidence
Management attributes softer 2026 ERCOT day-ahead pricing partly to post-2023 battery buildout, noting battery investors have realized about a fifth of expected returns and that battery interconnection queue growth is slowing as a result.
current state · 2026-08-07written 2026-09-15
C30factmedium confidence
EIA's latest outlook revised its ERCOT electricity demand growth forecast down to 5% for 2025 (from 6%) and 9.6% for 2026 (from an earlier 15.7% estimate); EIA separately expects more modest, continued demand growth in PJM over the same period.
forwardwritten 2026-09-15
C16facthigh confidence
Long-term debt including amounts due currently rose to $19,595M at June 30, 2026 from $17,043M at December 31, 2025.
current state · 2026-06-30written 2026-09-15
C14management claimmedium confidence
About $1.2B of buyback authorization remained as of August 2026, expected to be exhausted no later than end of 2027; management said it would seek additional authorization if it adds to the program in 2026.
against this

Management's own language - 'we expect to exhaust that no later than end of 2027' - is itself a target, not a commitment, and the same capital could instead go to additional debt paydown if the investment-grade ratings push takes priority, which management named as a live alternative use of cash.

forwardwritten 2026-09-15
C21facthigh confidence
Vistra agreed to acquire Cogentrix Energy (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility) for approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares; FERC approval was received and close is expected mid-to-late 2026.
forwardwritten 2026-09-15
C32management claimmedium confidence
A Texas Governor-directed audit paused PUC/ERCOT review of the large-load interconnection queue ("Batch Zero") for what management expects to be a couple of months as of August 2026; management does not expect its Comanche Peak-area project (targeted to energize end of 2027) to be affected, though nearer-term (2026) projects elsewhere could see delay.
against this

Management's own framing is self-interested - no company facing a queue audit would forecast material harm to its own timeline on the call announcing it - and the audit's scope and duration were still undefined at the time of the call.

current state · 2026-08-07written 2026-09-15
What we still do not know
  • How much Texas data-centre demand gets signed. There is no signed Texas deal of Meta's size yet.
  • What Cogentrix's existing power contracts carry. They are private and not separately disclosed.
The evidence under this - 2 claims
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
C21facthigh confidence
Vistra agreed to acquire Cogentrix Energy (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility) for approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares; FERC approval was received and close is expected mid-to-late 2026.
forwardwritten 2026-09-15

What would change our view

  1. Neutral→NeutralThe discount to its own history closes

    It needs:

    • ○The whole company is priced at about 11.5 times underlying profit, its own five-year norm, so the discount is gone.about ≈$162.76 today, 19% above the last close
  2. Neutral→NeutralThe load that justifies more than guidance never signs

    It needs any of:

    • ○Signed data-centre demand is still little more than the Meta deal by 2028, rather than several gigawatts.watched as it happens
    • ○The 2027 profit aim is actually cut, not just talked down, because realised power prices fell.checked at the next results, due by 5 Nov
    • ○Building power on site becomes the normal way to supply a new data centre, bypassing the grid.watched as it happens
We would also be wrong if
  • The Cogentrix purchase or the nuclear upgrades for Meta slip or are repriced.
  • Debt grows faster than profit as buybacks and borrowing-funded growth continue together.

What is coming

  • 5 October 2026 Reported Energy Department loan for nuclear uprates, expected to be announced: Whether federal debt funds the PJM uprates behind the Meta contracts, at what size and rate, and how much it adds to debt against EBITDA.
Every dated event ahead
  • 5 October 2026 Reported Energy Department loan for nuclear uprates, expected to be announced: Whether federal debt funds the PJM uprates behind the Meta contracts, at what size and rate, and how much it adds to debt against EBITDA.
  • 15 October 2026 Series A preferred first reset date: Whether Vistra redeems the 8.0% preferred with the new junior notes as signalled, or lets it reset at Treasury plus 6.93%.
  • 6 November 2026 Q3 2026 results: Whether the 2027 Adjusted EBITDA midpoint opportunity of $7.4-7.8B holds, with Cogentrix nearer close, Batch Zero timing, and signed load beyond Meta.
  • December 2026 Cogentrix acquisition closes: Whether the 5,500 MW deal closes on its terms in 2026 as guided; a slip past 2026 is a named pressure in the next test.
  • 15 December 2026 Series B preferred first reset date: Whether the second $1.0B of preferred is redeemed, completing the swap of preferred for junior notes.
Since we wrote this
Written
24 Aug
Price the thesis read
$136.21
21 Aug
  • 15 OctNewsVistra redeems its $1.0B 8.0% Series A preferred stock, as the September notes signalled. View heldVistra redeems all $1.0B of its 8.0% Series A preferred stock on the 15 October reset date.
  • 12 OctThesis reviewView moved from Attractive to NeutralThe price discount that made up most of the case has nearly gone and the business has not changed.
  • 6 OctNewsEnergy Department offers Vistra a conditional loan of up to $4.2B for nuclear plants. View heldEnergy Department said to offer Vistra a conditional loan commitment of up to $4.2B for nuclear uprates.
  • 5 OctThesis reviewThe long case now sits under the verdictAfter the five-name pilot, the owner asked for the long case on every thesis.
  • 4 OctThesis reviewOwner's checklist: revenue streams, cost of growth, management, catalystsThe owner's checklist found the method silent on who runs the company, what growth costs, where the money comes from and what is dated ahead; this pass fills those four blocks from the proxy and filings.
  • 15 SepThesis reviewTwo open questions turned out stale. View heldThe grid rule filings had been made months earlier, and the Texas queue audit ran past its expected two months. Nothing was read to a primary source, so no claim moved.
  • 24 AugThesis writtenAttractive, medium convictionTwo weeks after a quarter whose reported earnings missed by 52.8% on paper hedge losses while underlying profit grew over 30%.

Also checked 18 times with nothing new to act on.

Sources 22

Where this came from

Sources - 22

Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.

  1. S01primarycompany filing2026-02-27
    fleet composition, segments, nuclear PTC, Meta PPA, Cogentrix and Lotus transaction terms, competition section, risk factors
    backsC01C02C07C08C18C19C20C21C22C26C27C42C43C48C49
  2. S02primarycompany filing2026-08-10
    balance sheet, debt schedule, share count, EPS, liquidity as of 2026-06-30
    backsC16C17C43
  3. S03primarycompany filing2026-08-07
    Adjusted EBITDA by segment, guidance ranges, hedging loss detail, buyback and liquidity figures, Cogentrix FERC approval, Helix announcement
    backsC03C04C05C06C13C14C15C21C24C39
  4. S04primarytranscript2026-08-07
    Vistra Q2 2026 earnings call transcript
    management's ERCOT/PJM load-growth framing, Batch Zero audit color, Helix detail, capital allocation and leverage targets, RTC+B/battery commentary
    we put out a load forecast a little over two years ago in May of 2024 with an expectation of 115 to 120 gigawatts of load in ERCOT in 2030 ... we think is somewhere in the 12 GW to 15 GW by 2030. When you have numbers overstated by more than 20x, it causes problems for policy makers.
    backsC04C05C13C14C17C20C23C24C25C26C27C29C32C34C37C38
  5. S05primarycompany filing2026-02-24
    confirmation of integrated generation-plus-retail model as a cohort peer
    backsC41
  6. S06primarycompany filing2026-02-26
    confirmation of pure-play PJM merchant generation as a cohort peer
    backsC41
  7. S07primarycompany filing2026-02-24
    confirmation of generation-plus-retail model as a cohort peer, nuclear-heavy asset mix
    backsC41
  8. S08secondarynews2026-08-24
    Utility Dive - EIA cuts 2026 power generation forecast, ERCOT/PJM demand growth EIA (via Utility Dive)
    independent EIA-sourced ERCOT and PJM electricity demand growth rates
    the EIA revised its forecast of ERCOT growth rates, shrinking its projections from 6% to 5% growth in 2025 and 15.7% to 9.6% growth in 2026
    backsC30
  9. S09secondarynews2026-08-24
    Latitude Media / RTO Insider / Utility Dive - ERCOT large-load interconnection queue ERCOT (via trade press)
    independent size of the ERCOT large-load speculative queue
    ERCOT's large load interconnection queue sits at 410 GW, about 87% of which are data centers
    backsC28
  10. S10secondarynews2026-08-24
    Utility Dive - ERCOT 2030 load growth planning projections ERCOT (via trade press)
    independent ERCOT-sourced systemwide 2030 peak demand estimate
    ERCOT anticipates about 152 GW of new load on its system by 2030
    backsC31
  11. S11secondaryindustry data2026
    Cleanview - Bypassing the Grid: How Data Center Developers Are Building Their Own Power Plants Cleanview
    independent tracking of behind-the-meter/off-grid data-center generation capacity
    approximately 2 GW of behind-the-meter generation capacity is online across four projects, with the vast majority belonging to xAI
    backsC35
  12. S12secondarygovernment data2025-12-05
    ERCOT RTC+B go-live market notices and trade coverage (GridBeyond, ercot.com) ERCOT
    confirmation and date of ERCOT's scarcity-pricing market redesign
    Under the RTC+B regime, the ORDC adder to the energy prices is removed, and replaced by adders to real time ancillary service prices, known as ASDC
    backsC33
  13. S13secondarygovernment data2026
    EIA - Plant Vogtle Unit 4 begins commercial operation / US nuclear construction status EIA
    independent confirmation that no new large nuclear capacity is being added, supporting the scarcity of Vistra's existing licensed fleet
    No nuclear reactors are under construction now in the United States.
    backsC36
  14. S14secondarynews2026-08-23
    The Motley Fool - Vistra Is the Quietest Big Winner of the AI Power Boom
    evidence of the consensus AI-power framing of the stock
    read, but no claim rests on it
  15. S15secondarynews2026-08-07
    Reuters - Vistra quarterly profit slips on hedging losses despite strong power demand
    independent read on the Q2 2026 GAAP miss and its hedging-loss driver
    read, but no claim rests on it
  16. S16secondaryvendor data2026-08-24
    Portfolio-management research pack (market tier: price, insiders, analysts, congressional, peer valuation)
    content/VST/research-pack.json
    price/volatility snapshot, insider Form 4 aggregation, analyst consensus, congressional disclosures, cohort valuation multiples
    backsC39C40
  17. S17primarycompany filing2026-08-24
    data/reference/competitors.json - VST filed-competitor-class cohort review
    data/reference/competitors.json
    the research-tier cohort build (NRG, TLN, CEG) and each peer's confirming quote
    backsC41
  18. S18primarycompany filing2026-02-26
    the original 2026 guidance ranges and the agreements announced alongside full-year 2025 results
    backsC04C05
  19. S19primarycompany filing2026-05-07
    Q1 2026 buyback pace and Adjusted EBITDA progress, corroborating the full-year buyback and guidance trend
    backsC13C14
  20. S20primarycompany filing2026-03-18
    executive officer and director biographies, beneficial ownership as of March 3, 2026, the 2025 annual incentive scorecard and payout, the PSU design and the 2023 PSU result
    backsC45C46C47
  21. S21primarycompany filing2026-09-24
    $850M 7.000% Series A and $650M 7.250% Series B junior subordinated notes due 2057, issued by Vistra Operations and guaranteed by Vistra
    backsC49
  22. S22primarycompany filing2026-09-10
    use of proceeds: general corporate purposes including redeeming some or all of the Series A and Series B preferred stock at or after their October and December 2026 reset dates
    backsC49
Rendered from content/VST/thesis.json · thesis reviewed 2026-09-15. This page explains a company; it does not say what to pay, when to buy or how much.